Sample data for demonstration only.
Áegis Living

Northern California

October
Communities 10Units 827View Region
View by

Spenddown

Áegis Insights summary

Northern California is at 89.1% occupancy, 0.6 points below budget. Controllable spend for October was $2.31M against an occupancy-adjusted target of $2.32M, under by $8.71k (-0.4%). A flat budget set at planned census would show $2.33M and hide the cost that should have come out with the missing residents.

Biggest driver
Food and Beverage is $2.14k over its occupancy-adjusted target (0%), followed by Agency Labor at $1.79k and Laundry and Linen at $895. Most of it sits at Moraga $1.31k, Pleasant Hill $1.30k.
What flexes with census
Áegis Insights learned from 24 months of each line that 61% of controllable spend moves with residents and the rest is fixed. Each point of occupancy moves the target by about $15.88k for the period shown, so a missing resident is a cost problem as well as a revenue problem.
How it compares
2 of 10 communities in this view are above the company on spend against occupancy-adjusted target (+0.1%). The view as a whole is at -0.4%.
Pace this month
1 line is pacing over the November target on day 22, led by agency labor at Corte Madera. That is 8 days before the close.
If nothing changes
The flagged lines finish November about $1.54k over target, and the overage repeats each month until the run rate changes.

Top actions for Spenddown

Ranked by Áegis Insights on dollar impact and urgency. Assign sends an action to Task Management.

$34,796 at stake in these 4
1Move-out readiness
High

Be ready if four residents move out

Pleasant Hill

$10,063
Monthly cuts needed to stay at target after four move-outs

Open the occupancy what-if at four fewer residents and agree the cuts before the move-outs happen.

2Move-out readiness
Medium

Be ready if four residents move out

San Rafael

$9,304
Monthly cuts needed to stay at target after four move-outs

Open the occupancy what-if at four fewer residents and agree the cuts before the move-outs happen.

3Move-out readiness
Medium

Be ready if four residents move out

Corte Madera

$8,751
Monthly cuts needed to stay at target after four move-outs

Open the occupancy what-if at four fewer residents and agree the cuts before the move-outs happen.

4Move-out readiness
Medium

Be ready if four residents move out

Aegis Gardens

$6,679
Monthly cuts needed to stay at target after four move-outs

Open the occupancy what-if at four fewer residents and agree the cuts before the move-outs happen.

Financial performance

October, closed month, against budget

LineActualBudgetVarianceVariance %
Rent revenue$4,395,070$4,421,057-$25,988-0.6%
Care revenue$2,959,158$2,979,306-$20,148-0.7%
Total revenue$7,354,227$7,400,363-$46,136-0.6%
Labor cost$2,895,568$2,853,252$42,316+1.5%
Food cost$860,941$859,087$1,854+0.2%
Other operating expenses$2,517,333$2,539,613-$22,280-0.9%
NOI$1,080,385$1,148,411-$68,027-5.9%

Controllable expenses

Occupancy slider, occupancy-adjusted targets and the Áegis Insights cut plan. Utilities, telephone and internet, insurance and other fixed costs are not controllable and are left out.

Occupancy
89.1%
-0.6 pts vs budget
737 residents of 827 units · budget 89.7%
Controllable spend
$2,312,285
October · 16 GL lines
Target at current occupancy
$2,320,992
-$8,707 (-0.4%) actual vs target
A flat budget at 89.7% shows $2,330,451
Target at 90.0% scenario
$2,335,013
+$14,021 vs target today
744 residents · each point moves target $15,884

Occupancy what-if

Starts at the census forecast for the next month. Every target below recalculates as you move the slider.

90.0%
744 residents · +7 vs today
60%80%100%

Target spend by occupancy

October. The line is the target, the dashed line is what was spent.

$1.75M$2.17M$2.59M60%70%80%90%100%Actual spend
Today 89.1%Budget 89.7%Forecast 89.8%Scenario 90.0%

Spend is at or below target at today's census. Spend would be over target below 88.6% occupancy.

Pace this month

Through Nov 22, day 22 of 30. A line is flagged when its projected month end is more than 5% over the occupancy-adjusted target.

GL lineMonth to dateExpectedProjected month endOver targetFlag
Agency Labor$15,348$14,216$20,928+$1,543Running over

1 line is flagged on day 22, 8 days before the November close. Without the pace check the same overruns show up after month end.

Controllable GL lines

October, largest variances first. Target is the fixed share plus the variable share that follows residents. The split is learned from 24 months of each line. Scenario columns follow the slider.

GL lineVariable shareActualTargetVarianceVariance %Target at 90.0%Gap vs actual
Total controllable, all 16 lines61%$2,312,285$2,320,992-$8,707-0.4%$2,335,013-$22,728
6100 Overtime Premium90%$60,276$74,234-$13,958-18.8%$74,896-$14,620
5100 Food and Beverage88%$735,491$733,348+$2,143+0.3%$739,731-$4,240
6110 Agency Labor95%$21,773$19,980+$1,794+9.0%$20,167+$1,606
5210 Laundry and Linen65%$79,992$79,098+$895+1.1%$79,605+$387
5900 Office and IT21%$91,422$90,665+$757+0.8%$90,849+$574
Áegis Insights cut plan

Where to cut, ranked by dollars

For lines above the target at the current occupancy or at 90.0%, whichever is lower. Amounts are monthly. Accept a step to give it an owner and a due date. The next weekly summary checks whether it worked.

$1,488
recoverable per month
  1. #1Labor premiumCorte Madera $477, Carmichael $356

    Agency Labor: $1,794 over target, cut $1,488

    $1,488
    per month

    95% of this line moves with residents, so 83% of the gap can be recovered within the month. Fill open shifts from the float pool and part time staff first, and set a weekly cap on agency shifts.

    Due Thu, Nov 26
Nothing accepted yet

Accept the steps you agree with. They become tracked items with an owner and a due date.

$0
committed per month
After the October close

Variance Management

The largest actual versus budget variances for October, over $1,000 or over 5 percent of budget and $250. Open one to explain it with a note and a tag, assign a task and track it to resolved.

  1. DiningLargest in San Rafael

    5100 Food and Beverage

    Actual $736,971 against a budget of $734,746

    +$2,225
    +0.3% over budget
    Open

By community, against the occupancy-adjusted target

CommunityOccupancyVs budget (pts)Controllable spendOccupancy targetVarianceVariance %
Northern California, total89.1%-0.6$2.31M$2.32M-$8.71k-0.4%
Carmichael92.9%+0.5$246.76k$247.65k-$889-0.4%
Fremont93.2%-0.2$211.27k$213.74k-$2.48k-1.2%
Napa87.3%+0.6$149.42k$150.39k-$968-0.6%
San Rafael69.2%-6.5$205.19k$205.10k+$860.0%
Aegis Gardens90.0%-0.1$195.77k$197.94k-$2.17k-1.1%
Pleasant Hill91.6%+0.2$239.87k$238.50k+$1.36k+0.6%
San Francisco91.8%-0.2$245.89k$245.18k+$709+0.3%
Aptos93.3%+0.1$260.32k$263.74k-$3.42k-1.3%
Corte Madera94.3%+0.5$362.83k$363.58k-$745-0.2%
Moraga86.1%-0.5$194.96k$195.17k-$206-0.1%