Sample data for demonstration only.
Áegis Living

Southern California and Nevada

October
Communities 5Units 375View Region
View by

Spenddown

Áegis Insights summary

Southern California and Nevada is at 90.4% occupancy, 0.1 points above budget. Controllable spend for October was $1.07M against an occupancy-adjusted target of $1.06M, over by $10.68k (+1.0%). A flat budget set at planned census would show $1.06M and hide how spend follows census.

Biggest driver
Repairs and Maintenance Contract is $8.31k over its occupancy-adjusted target (9%), followed by Food and Beverage at $6.15k and Medical Supplies at $773. Most of it sits at Granada Hills $7.89k, Laguna Niguel $542.
What flexes with census
Áegis Insights learned from 24 months of each line that 61% of controllable spend moves with residents and the rest is fixed. Each point of occupancy moves the target by about $7.14k for the period shown, so a missing resident is a cost problem as well as a revenue problem.
How it compares
2 of 5 communities in this view are above the company on spend against occupancy-adjusted target (+0.1%). The view as a whole is at +1.0%.
Pace this month
1 line is pacing over the November target on day 22, led by repairs and maintenance contract at Granada Hills. That is 8 days before the close.
If nothing changes
The flagged lines finish November about $7.13k over target, and the overage repeats each month until the run rate changes.

Top actions for Spenddown

Ranked by Áegis Insights on dollar impact and urgency. Assign sends an action to Task Management.

$42,465 at stake in these 4
1Move-out readiness
High

Be ready if four residents move out

Granada Hills

$17,637
Monthly cuts needed to stay at target after four move-outs

Open the occupancy what-if at four fewer residents and agree the cuts before the move-outs happen.

2Move-out readiness
Medium

Be ready if four residents move out

Ventura

$7,904
Monthly cuts needed to stay at target after four move-outs

Open the occupancy what-if at four fewer residents and agree the cuts before the move-outs happen.

3Above occupancy-adjusted target
Medium

Repairs and Maintenance Contract is $7,890 over its occupancy-adjusted target

Granada Hills

$7,890
Monthly spend above the occupancy-adjusted target

Review contract scope and visit frequency, and rebid any contract that renews in the next 90 days.

4Move-out readiness
Medium

Be ready if four residents move out

Dana Point

$9,034
Monthly cuts needed to stay at target after four move-outs

Open the occupancy what-if at four fewer residents and agree the cuts before the move-outs happen.

Financial performance

October, closed month, against budget

LineActualBudgetVarianceVariance %
Rent revenue$1,995,690$1,987,790$7,900+0.4%
Care revenue$1,399,355$1,393,864$5,492+0.4%
Total revenue$3,395,045$3,381,654$13,392+0.4%
Labor cost$1,247,997$1,224,924$23,074+1.9%
Food cost$400,949$395,249$5,700+1.4%
Other operating expenses$1,163,572$1,145,629$17,943+1.6%
NOI$582,527$615,851-$33,325-5.4%

Controllable expenses

Occupancy slider, occupancy-adjusted targets and the Áegis Insights cut plan. Utilities, telephone and internet, insurance and other fixed costs are not controllable and are left out.

Occupancy
90.4%
+0.1 pts vs budget
339 residents of 375 units · budget 90.3%
Controllable spend
$1,072,346
October · 16 GL lines
Target at current occupancy
$1,061,662
+$10,684 (+1.0%) actual vs target
A flat budget at 90.3% shows $1,061,234
Target at 90.5% scenario
$1,062,376
+$714 vs target today
339 residents · each point moves target $7,140

Occupancy what-if

Starts at the census forecast for the next month. Every target below recalculates as you move the slider.

90.5%
339 residents · +0 vs today
60%80%100%

Target spend by occupancy

October. The line is the target, the dashed line is what was spent.

$794k$985k$1.18M60%70%80%90%100%Actual spend
Today 90.4%Budget 90.3%Forecast 90.7%Scenario 90.5%

Spend matches target at 91.9% occupancy. That is 6 more residents, about $60,089 of revenue, or cut $10,684 to close the gap at today's census.

Pace this month

Through Nov 22, day 22 of 30. A line is flagged when its projected month end is more than 5% over the occupancy-adjusted target.

GL lineMonth to dateExpectedProjected month endOver targetFlag
Repairs and Maintenance Contract$71,456$66,230$97,439+$7,126Running over

1 line is flagged on day 22, 8 days before the November close. Without the pace check the same overruns show up after month end.

Controllable GL lines

October, largest variances first. Target is the fixed share plus the variable share that follows residents. The split is learned from 24 months of each line. Scenario columns follow the slider.

GL lineVariable shareActualTargetVarianceVariance %Target at 90.5%Gap vs actual
Total controllable, all 16 lines61%$1,072,346$1,061,662+$10,684+1.0%$1,062,376+$9,970
5310 Repairs and Maintenance Contract15%$101,597$93,284+$8,313+8.9%$93,299+$8,297
5100 Food and Beverage88%$343,169$337,021+$6,148+1.8%$337,348+$5,822
6100 Overtime Premium90%$26,288$31,846-$5,558-17.5%$31,878-$5,589
5600 Medical Supplies89%$62,993$62,220+$773+1.2%$62,282+$712
5300 Repairs and Maintenance Supplies46%$78,396$77,753+$644+0.8%$77,793+$604
Áegis Insights cut plan

Where to cut, ranked by dollars

For lines above the target at the current occupancy or at 90.5%, whichever is lower. Amounts are monthly. Accept a step to give it an owner and a due date. The next weekly summary checks whether it worked.

$4,238
recoverable per month
  1. #1MaintenanceGranada Hills $7.89k, Laguna Niguel $542

    Repairs and Maintenance Contract: $8,313 over target, cut $4,238

    $4,238
    per month

    15% of this line moves with residents, so 51% of the gap can be recovered within the month. Review contract scope and visit frequency, and rebid any contract that renews in the next 90 days.

    Due Thu, Nov 26
Nothing accepted yet

Accept the steps you agree with. They become tracked items with an owner and a due date.

$0
committed per month
After the October close

Variance Management

The largest actual versus budget variances for October, over $1,000 or over 5 percent of budget and $250. Open one to explain it with a note and a tag, assign a task and track it to resolved.

  1. MaintenanceLargest in Granada Hills

    5310 Repairs and Maintenance Contract

    Actual $102,007 against a budget of $93,612

    +$8,395
    +9.0% over budget
    Open
  2. DiningLargest in Granada Hills

    5100 Food and Beverage

    Actual $343,342 against a budget of $338,043

    +$5,299
    +1.6% over budget
    Open

By community, against the occupancy-adjusted target

CommunityOccupancyVs budget (pts)Controllable spendOccupancy targetVarianceVariance %
Southern California and Nevada, total90.4%+0.1$1.07M$1.06M+$10.68k+1.0%
Laguna Niguel93.2%+0.6$212.80k$212.52k+$278+0.1%
Dana Point94.7%+0.2$222.72k$222.19k+$535+0.2%
Granada Hills89.9%+0.1$231.42k$222.32k+$9.09k+4.1%
Ventura87.2%+0.1$233.77k$234.82k-$1.06k-0.5%
Las Vegas88.7%+0.8$171.65k$171.72k-$720.0%